Archives
- 17 Nov E-Paper Calendar V2: Case Closed! The Price of Octal PSRAM
- 16 Nov New Website Live! My English Dev Log
- 09 Nov E-Paper Calendar V2: The Rabbit Hole of AI Hardware Integration
- 19 Sep E-Paper Calendar V2 Hardware: Ultra-Low Power
- 28 Aug E-Paper Calendar V2 Hardware: Haste Makes Waste
- 17 Aug E-Paper Calendar V2 Hardware: V1 Validation and V2 Design
- 15 Aug E-Paper Calendar V2 Hardware: The Story of the First PCB
- 05 Jul E-Paper Calendar V2: Directing AI to Assemble the Puzzle
- 17 May E-Paper Calendar V2: Wi-Fi Setup and ICS Parsing
- 01 May E-Paper Calendar V2: Lighting Up the Display
- 22 Apr E-Paper Calendar V2: How Hard Can Drawing Mandarin Be?
- 19 Apr E-Paper Calendar V2: Lighting Up the Mainboard
- 12 Apr E-Paper Calendar V2: Planning and Scheduling
- 11 Apr E-Paper Calendar v2: Kick-off
- 23 Dec Cross-Compiling a Raspberry Pi Driver
- 23 Dec My Linux Driver Learning Journey
- 23 Dec Reflections After Three Months as a Google Software Engineer
- 11 Aug The Google Dream Plan
- 22 May E-Paper Calendar Ep.5 — Power Management and System Design
- 02 May E-Paper Calendar Ep.4 — Layout Design and Calendar Integration
- 17 Apr E-Paper Calendar Ep.3 — Fetching Calendar Data and Displaying It
- 10 Apr Setting Up the Matter Device Development Environment
- 21 Jan E-Paper Calendar Ep.2 — The E-Paper Display
- 13 Jan E-Paper Calendar Ep.1 - Kicking Off The Project